|
|
||||||||||||||||||||||||||
|
|
8350 Pardee Drive Project, Oakland Airport Business Park
Runway Safety Area Improvement Project
The Port of Oakland proposes to implement a Runway Safety Area (RSA) Improvement Project for Oakland International Airport to enhance the level of safety provided by RSAs at the Airport and comply with Federal Aviation Administration design standards, as required, by December 31, 2015. The Port has prepared a draft Environmental Assessment, in compliance with the National Environmental Policy Act (NEPA), and a Draft Initial Study/Mitigated Negative Declaration, in compliance with the California Environmental Quality Act (CEQA), which are available for public review beginning March 20, 2012. (For information on the April 19, 2012 public meeting, please see the Public Notice below.) Public Notice
Environmental Documents
Airport Perimeter Dike Improvement Project
Port of Oakland Publications
The Port of Oakland has the following publications available free of cost as either hard copy or as a link. Summary Report to West Oakland Neighbors
Vision 2000 Air Quality Mitigation Program
As part of the “Vision 2000 (V2K) Maritime Development Program,” the Port established an Air Quality Mitigation Program (AQMP). The AQMP includes ten main projects to reduce air emissions from a variety of sources, one of which includes several design and operational features for the Port. View Report Onboard Testing of Ballast Treatment Efficiency: Summary Report
Results of on-board tests of a ballast water treatement system on a cruise ship and a container vessel. The Port was one funder of the study. View Report View Figures Ballast Water Study
A pilot study by the Smithsonian Environmental Research Center of ballast water in container ships arriving to the Port of Oakland. View Study 2005 Environmental Annual Report
Learn about the different environmental programs and projects at the Port of Oakland. View Report
|
||||||||||||||||||
|
The Port & You |
Maritime | Airport
| Real Estate | Newsroom
Copyright ©2000-2013 | Terms
Port of Oakland. All rights reserved. Credits.Job Center | Doing Business | Community | Environment | Contact Us |
||||